Railway Signalling & Telecommunication (S&T) works executed across Eastern & adjacent zones — interlocking, communication networks, cabling, surveys, installation & commissioning.

Filter:
Project image
Completed 2024
Bardhaman–Katwa Section Communication Upgrade
Eastern Railway  •  West Bengal
  • 24F OFC backbone & 6F access
  • Quad cable laying – 52 km with jointing & termination
  • EB & TP integration; way-side equipment installation
  • As-built documentation & training
Outcomes
  • Cutover achieved without traffic block
  • 95% link uptime within first 7 days of monitoring
Project image
Completed 2023
Electronic Interlocking (EI) & Outdoor Gear Works – Sealdah Yard
Eastern Railway (Sealdah)  •  Kolkata, WB
  • EI field wiring & outdoor gears (point machines, signals, track circuits)
  • Location boxes fabrication & installation
  • Cable termination, testing & commissioning
Outcomes
  • Commissioned during night blocks as per safety protocols
  • All acceptance tests cleared on first attempt
Project image
Ongoing 2025
Capacity Augmentation – Initial Field Survey for 3rd Line
Rail Vikas Nigam Ltd. (RVNL)  •  Hooghly & Bardhaman, WB
  • Route walkouts & site feasibility with GPS referencing
  • Preliminary BOQ, WBS & schedule
  • Risk register and access planning (ROW, utilities)
Outcomes
  • Optimized alignment proposals handed to client
  • Stakeholder sign-offs underway
Project image
Completed 2022
Block Instrument & TP/E1 Link Standardization – Howrah Division
Eastern Railway (Howrah)  •  Howrah–Bandel, WB
  • Block instruments refurbishment & interface standardization
  • TP/E1 link testing, alignment & documentation
  • Staff orientation & handover
Outcomes
  • Reduced fault incidence by 37% over 90 days
  • Unified documentation repository delivered
Project image
Completed 2024
Signalling Cable Renewal – Level Crossings & IBS
South Eastern Railway  •  WB & Jharkhand
  • Trenching, HDPE ducting & cable laying for LC gates & IBS
  • Jointing, termination & insulation testing
  • Earthing & surge protection checks
Outcomes
  • Zero NCRs during inspection
  • Final test reports submitted within 48 hours of completion
Project image
Ongoing 2025
Wayside Communication Assets – Preventive Maintenance
ECR (Dhanbad)  •  Jharkhand
  • Periodic inspection & PM of wayside S&T communication assets
  • Spare provisioning & fault rectification SLA
  • Monthly health reports
Outcomes
  • Uptime above 99.2% YTD
  • MTTR under 4 hours on average

Ratings & Reviews

Priya Iyer

“Handled OTDR traces and closures neatly—no repeat visits required. Good coordination with our SSE.” (Divisional Telecom Engineer, Bhubaneswar, OD — OFC Splicing & OTDR – Section A)

Rajesh Kumar

“Professional team; achieved block hand-backs exactly on plan. Documentation was tidy and audit-ready.” (Sr. Section Engineer (S&T), Howrah, WB — SSI Cutover – Suburban Yard)

Arindam Ghosh

“Clear BOQ and resource plan; mobilised quickly. Safety briefings were consistent at site.” (Project Manager – EPC, Bardhaman, WB — Quad Cable Laying – Block Section)

Neha Sharma

“Interlocking cutover executed smoothly; crisp punch-point tracking and swift closure.” (Assistant Engineer (AEN), Kharagpur, WB — EI Room Refurbishment – Junction)

Farhan Ahmad

“They stuck to method statements and kept client informed on daily progress. Reliable partner.” (Contractor – S&T, Dhanbad, JH — Exchange Link Testing – Division)

Sangeeta Mukherjee

Night block executed safely and on time—team followed clear checklists, coordinated with our control, and restored services within the permitted window. As-built records were thorough and easy to audit. (Sr. Section Engineer, Sealdah, WB)